Increasing aircraft carrier forward presence: changing the length of the maintenance cycle

Object category:
Elektronische Ressource
Providing institution:
Forschungsbibliothek Gotha
Publisher:
RAND Corp
Ort:
Santa Monica, CA
Date:
2008
Language:
Englisch
Abstract:
The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs
The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs
Object text:
Roland J. Yardley [and others]
"MG-706-NAVY"--Page 4 of cover
"Prepared for the United States Navy
Includes bibliographical references (pages 67-70)
Research conducted within the Rand National Defense Research Institute
Use copy Restrictions unspecified star MiAaHDL
Electronic reproduction
[S.l.] HathiTrust Digital Library 2010 Electronic reproduction |2010||||||||||
Master and use copy. Digital master created according to Benchmark for Faithful Digital Reproductions of Monographs and Serials, Version 1. Digital Library Federation, December 2002.
Created:
2023-04-13
Last changed:
2019-10-11
Added to portal:
2023-04-13

Ähnliche Objekte

Entdecken Sie ähnliche Objekte. Über die Datenfelder können Sie die Objekte auswählen, die Sie interessieren. Sie können Ihre Suchfilter beibehalten oder deaktivieren.


Suchfilter berücksichtigen